KneppKraft Call Send Us Photos
Shoring, Bracing & Seismic Retrofit

Shoring, Bracing & Seismic Retrofit

KneppKraft is a licensed General Engineering contractor in LA and Orange County. Temporary shoring to work safely, structural bracing to stabilize, and seismic retrofit to bring buildings up to code, engineered support for commercial and soft-story structures.

#547307ABCA Lic. A + B
Shore SafelyWork Without Risk
Steel & BracingStabilize & Retrofit
LA / OCCommercial & Multifamily
What It Is

Hold it up safely, then make it stronger.

Whether a structure needs temporary support during a repair, permanent bracing to stabilize it, or a full seismic retrofit to meet code, KneppKraft engineers and installs the support. We shore safely so crews can work, brace what needs to stay, and retrofit weak structures, including soft-story buildings, to carry seismic loads.

As a licensed General Engineering contractor, we coordinate with your structural engineer and tie this into the broader structural repair. Under a city order? See soft-story seismic retrofit.

When you need it

  • Temporary shoring during repairs
  • Bracing for unstable or damaged structures
  • Soft-story seismic retrofit
  • Steel moment frames & brace frames
  • Post-damage emergency stabilization
  • Load-path reinforcement
The Process

How a shoring and bracing job goes

01

Assess

Evaluate the structure and the loads with your engineer.

02

Shore

Install temporary support so work proceeds safely.

03

Reinforce

Steel frames, bracing, and connections to spec.

04

Verify

Inspect and sign off, stronger than we found it.

Shoring & Bracing

Holding the load while we work

Common Questions

What is the difference between shoring and bracing?

Direction and duration. Shoring holds weight up. It goes in when a member carrying gravity load is about to come out, and it comes back down once the finished piece is doing its job again. Bracing resists sideways movement, the kind an earthquake or a windstorm puts into a building, and bracing is normally there for good. Plenty of jobs need both, in that order.

Can we keep operating with posts in the building?

Usually, with the floor plan worked around them. A post needs solid bearing underneath and a clear footprint at its base, and forklift traffic has to route around the zone rather than through it. We tape the area off and mark every post so nobody clips one. Racking sitting directly under the shored bay is the part that generally has to move.

How long does temporary shoring stay in?

Until the finished repair is taking the load and the engineer releases it. That is the honest answer, because the clock gets set by material lead times and inspection dates more than by our crew. What you will get from us is the schedule we are working to, and a phone call if it slips. Posts left standing for months with nothing happening around them mean a job stalled.

Does a seismic retrofit make the building code compliant?

It brings the building up to the standard the ordinance sets for existing buildings, which is a lower bar than a new one has to clear. Nobody can make an old building earthquake-proof, and anyone telling you otherwise is selling. What a retrofit buys is a much better chance the place stands up and empties out, plus your address off the city’s list.

Start Here

Need a structure shored, braced, or retrofit?

Send details or your engineer’s plans: we’ll scope the support.

Request an Assessment